This company needed to add storage to their burgeoning lubricant distribution center. Historically product was received by transport and offloaded into totes and drums directly from the transport in the parking area. The totes and drums were then relocated inside the storage facility and often repackaged. Modifications to the building were not permitted – the challenge was to install maximum sized vertical tanks inside the building through the existing entrance. The project required transport offloading pumps/meters and internal pumps/meters for small packaging including a PLC system for automated control of the packaging. The project was successfully commissioned meeting all design requirements.